Toilet renovation: at Which to start

The bathroom is a room with particular terms: high humidity, humidity differences. That’s why making fixes in the bathroom, you should clearly plan the entire operating process, to think about the sequence of measures to be performed. Within this report, you will discover where to begin the fix in the restroom and what kinds of work should be carried out with your hands. Step-by-step instructions for bathroom repair

Phase 1: Establishing a plan and deciding upon a layout solution.

Fix in the toilet can be of 2 types:

  • Unplanned, spontaneous, originating from the can of unforeseen circumstances. By way of instance, in the event of an pipe burst, flooding with neighbors.
  • Planned, that is either capital or cosmetic. It requires planning, serious fiscal investment and time.

Begin repairs at the bathroom is to ascertain the design, interior. Think through the last detail, what’s going to be the room, select a color. Pastel colors are conventional, in addition to a mixture of blue and blue, pink or cherry with beige.

Begin repairs at the toilet is to determine the design, interior design. Think in detail, what’s going to be the room, choose a colour. Pastel colours are thought to be traditional, as well as a mixture of colours.

The next point is that the choice of facing substance. Usually, finishing at the bathroom is performed with tile, porcelain tiles, mosaicand plastic panels. Examine the plumbing, whether it ought to be mended. If necessary, choose the right option. Proceed to the measuring function: quantify all sides, figure out the area of the area. Based on these data, we indicate the location of these plumbing fittings.

Step 2: the choice of sanitary fixtures and substance for finishing.

It is important to understand that the purchase price of sanitary ware precedes the preparation stage, rather than vice versa. This usually means that first we create a new design project, create a plan, and then go to the store. Yet another thing – you should specify the size of your favorite plumbing fittings and check the plan, whether it fits.

It’s crucial to recognize that the cost of plumbing fixtures is completed by a planning period, rather than vice versa. This means that first we create a design project, create a plan, and vsyakuhnya.ru then go to the shop. Another one

In terms of materials for finishing, it’s preferable to purchase them immediately for the whole repair cycle, in order that then you will not be distracted if something has been missing. Do not forget about preparing the vital tools.

Step 3: dismantling plumbing and tiling.

Once all the preliminary work is completed, move on to the Start of the task process:

  • Eliminate the sink and tub from the room, even though they will not be replaced with new ones. In this way, you may keep them clean and undamaged.
  • Remove the tile, cleaning following it all surfaces: walls, ceiling, flooring.
  • Remove old paint from the walls, if they were previously painted, as the glue alternative or a new layer of paint will not adhere to the surface.

Step 4: Cost of communications: plumbing, electric wiring.

Quite frequently in an older house, you should carefully inspect and replace not only the pipes that are in the toilet itself, but in addition the most important riser, and sometimes the interfloor plumbing. Why is it worth doing this? Old pipes anytime may give a leak, then the new repair is going to be emptied, it is going to call for additional investment to get rid of defects.